
WILMINGTON — Two projects are making their way to the city’s planning commission in coming months and could bring almost 400 units to the region. One consists of all workforce housing.
Apex at Carolina Beach is from Blue Ridge Cascade, a workforce housing developer known for Apex at Avenue Flats and Apex on Market Street. Apex at Carolina Beach will be an 84-unit apartment complex slated for 3916 and 3920 Carolina Beach Road and 4069 Echo Farms Boulevard. Currently, the area consists of aging residential and commercial structures that Blue Ridge states “no longer serves a productive role in the area.”
Due to an increased demand for workforce housing, as expressed by city council in recent years, the group wants to transform the property to benefit working, moderate-income households. The project will serve area media incomes between 30% ($22,950 for one person) and 70% AMI ($53,508 annually for one person), with the unit breakdown being 18 one-bedroom, 30 two-bedroom and 36 three-bedroom units.
READ MORE: Wilmington planning staff working on open space zoning district
Based on the U.S. Department of Housing and Urban Development’s AMI breakdown, rent could be anywhere from $600 to $1,340 monthly.
“The City of Wilmington and surrounding region have experienced significant population growth, placing pressure on housing costs,” the Blue Ridge narrative indicates. “The limited availability of housing that is affordable to moderate-income households, particularly in central, transit accessible locations, has created a gap that this project is well-positioned to help fill.”
To bring the project to fruition, the team is requesting to rezone 8.16 acres from R-15, a moderate-density, single-dwelling residential district allowing roughly 3 dwelling units per acre. Blue Ridge is asking for MD-17 conditional zoning, intended for urban areas near commercial services and amenities, also supporting redevelopment and infill on smaller sites.
Normally, MD-17 zoning allows 17 dwelling units per acre, which can double to 36 with a density bonus if a project is all workforce housing.
A city spokesperson said: “The general density allowances under MD-17 would not be applicable if this rezoning were to be approved,” due to Blue Ridge’s request being conditional, so “the site plan with approved unit count would govern the site upon rezoning approval.”
Blue Ridge argues the zoning is consistent with surrounding properties, as the area has been rezoned to commercial business and MD-17 allowing for a transition from high to low density. The property is near two mixed-use centers and two transient-oriented mixed-use centers, including the Crossroads at Independence. Thus, it is near employment opportunities and has public transportation options.
With the nearby Flossie Bryant tract also in the works to become a public park nearby, the inclusion of sidewalks and upgrades to the property will make it more walkable and improve connectivity, according to the Blue Ridge team. They called it a continued “revitalization” of Carolina Beach Road to support more businesses and become more functional for residents, thus also a part of the city’s “Mixed Use Places” redevelopment strategy.
The apartment complex will consist of four structures, one of which will be a community center, with the apartment buildings being from 30- to 40-feet tall. The acreage includes 0.77 acres of wetlands, not to be disturbed, and two stormwater ponds and the flow of water will move away from northern neighborhoods into the wetlands. No specimen trees are being removed from the property.
Roughly 2.5 acres will be proposed impervious surface, inclusive of 129 parking spaces of which 12 will be ADA — less than the 231 maximum spaces allowed. The trip generation is estimated to be 556 in total on weekdays, with development access points on Carolina Beach Road and Echo Farms Boulevard. The developers are not required to conduct a traffic impact analysis, according to the City of Wilmington since trip generation doesn’t warrant one.
Traffic was a concern to some residents, according to community meeting notes submitted by Blue Ridge. More than a dozen people attended earlier this month to hear more about the project, many requesting the removal of a roadway connection to Echo Farms Boulevard — or to restrict it for emergency vehicles. Blue Ridge informed them the city encourages connectivity to adjacent neighborhoods.
After the community meeting, Dan Myers wrote to the development team that Apex should only be accessible from the main corridor of Carolina Beach Road and not Echo Farms Boulevard. Primarily, he thought it would better protect the makeup and character of the single-family home neighborhoods adjacent to the project.
“The light at EFB and CBR is already becoming overloaded with cars at peak travel times,” Myers added. “The cars now using that intersection have ballooned with new residents from the apartments/homes/townhouses built on what used to be the Echo Farms golf course land. Any additional traffic from the development using the building lot on EFB would be intolerable.”
According to North Carolina Department of Transportation traffic volume maps, Carolina Beach Road near Echo Farms was ushering through 37,400 cars daily as of 2025.
Myers also asked for privacy fencing facing Ridge Road and Echo Farms Boulevard.
Others had concerns about lack of privacy near their homes, worrying residents from the high floors of the apartment would be able to view down on surrounding properties or incoming and outgoing traffic and headlights would be disruptive. Blue Ridge President Sam Weldon agreed to install a privacy fence along Crab Apple Lane to strengthen the barrier between the neighborhoods.
Residents of Crab Apple Lane submitted a letter to the developers and the city also asking for traffic-calming measures, a restricted resident-only gate to prevent “cut-through” traffic, and for construction staging to steer clear of Crab Apple Lane.
Apex at Carolina Beach will go before the City of Wilmington Planning Commission at the Jan. 6 meeting.
Paseo Wilmington

Having first been announced in 2022, Paseo is a mixed-use project from Craig Davis Properties, known for commercial, multifamily, industrial, mixed-use, and institutional real estate across North Carolina.
In Wilmington, the group wants to bring 298 residential units and a 14,400 square-foot commercial space to S. College Road. The project is planned on parcels once housing a Honda dealership located at the corner of Wilshire Boulevard and College Road. The buildings have since been razed for a new project.
“The proposed development will make efficient use of an existing urban site and establish a coordinated development pattern consistent with the property’s UMX zoning and the surrounding urban context,” according to the developer narrative submitted to the city.
However, the developer is asking for a conditional district rezoning on the 6.06 acres at 812 S. College Road. The property is located next to the empty K-Mart parking lot and across from Harris Teeter.
According to a City of Wilmington spokesperson, the project’s commercial square footage has changed from its original 15,000 and there are modifications to the configuration of the associated site plan.
Port City Daily reached out to Craig Davis Properties about its goals for the commercial portion but didn’t hear back by press. Site plans show it will consist of two ground-floor 7,200-square-foot buildings facing College Road, but indication on the types of businesses there.
The residential building is described as luxury, market-rate apartments on the developer website. There will be one- and two-bedrooms offered, featuring quartz countertops, kitchen islands and pantries, top-of-the line appliances, balconies, walk-in closets, double sinks in master bathrooms, and linen closets in all bathrooms.
Roughly 65 units measure 900 square feet, according to the site plans, though measurements of other are not included. There is also an 8,500-square-foot courtyard and an 11,600-square-foot pool courtyard centered in the middle.
Structure parking and what appears to be a top floor deck will be constructed in the center, to provide 473 vehicular spaces, with 53 at ground level, along with 20 bicycle parking spaces. According to the estimated traffic impact, there will be almost 2,600 vehicles entering and exiting throughout the day, with peak hours bringing 132 in the morning and 262 in the evening.
A letter by WMPO notes from the 2021 impact analysis: “Based on review of the analysis provided in the TIA report, no improvements are required by the developer.”
Two access points will be built into the development, from Wilshire Boulevard and South College Road. Pedestrian improvements are also planned, such as sidewalks, marked crossings, landscaped planting areas, and safe connections to the surrounding streets.
The Wilmington Planning Commission will take up the project at its Jan. 6 meeting.
At Port City Daily, we aim to keep locals informed on top-of-mind news facing the tri-county region. To support our work and help us reach more people in 2026, please, consider helping one of two ways: Subscribe hereor make a one-time contribution here.
We appreciate your ongoing support.

