Here’s a list of road construction work May 22 – 29, per the City of Wilmington and North Carolina Department of Transportation.
City of Wilmington
- 41st Street – nighttime lane closures between Shipyard Boulevard and Oleander Drive until June 3 for repaving and repairs. Two-way traffic and access to all businesses, schools and residences in that area will remain at all times.
- Brenda Drive – partially closed and open to local traffic only until June near Carolyn Drive for the installation/replacement of stormwater drain pipes
- Randall Parkway – intermittent eastbound right lane closures between Marlboro Street and Kerr Avenue for road widening and construction of the Cross-City Trail
New Hanover County
- SR 2169 (Fredrickson Road) – closed permanently in both directions near SR 2145 due to construction of the Wilmington Bypass
- US 421 (Carolina Beach Road) – nighttime construction between NC 132 (College Road) and Snow’s Cut Bridge until May 2017 for grading, drainage and paving work as well as the installation of signals
A reminder: the Third Street Bridge in downtown Wilmington is now open.
Brunswick County
- NC 133 (River Road/Village Road) – periodic lane closures for nighttime construction until November 15 to design and build a divergent diamond interchange
- NC 211 (Honey Island Swamp) – lane closures just south of the Columbus County line for bridge construction until June 30
- SR 1551 (Blackwell Road), US 17 (Ocean Highway), US 74 (Andrew Jackson Highway) – periodic lane closures for widening of US 17/74/76 from River Road/Village Road to the US 421/NC 133 interchange west of Wilmington